Public companies are required to disclose risks that can affect the business and impact the stock. These disclosures are known as “Risk Factors”. Companies disclose these risks in their yearly (Form 10-K), quarterly earnings (Form 10-Q), or “foreign private issuer” reports (Form 20-F). Risk factors show the challenges a company faces. Investors can consider the worst-case scenarios before making an investment. TipRanks’ Risk Analysis categorizes risks based on proprietary classification algorithms and machine learning.

TXNM Energy disclosed 24 risk factors in its most recent earnings report. TXNM Energy reported the most risks in the “Finance & Corporate” category.

Risk Overview Q4, 2023

Risk Distribution
24Risks
29% Finance & Corporate
21% Production
21% Macro & Political
17% Legal & Regulatory
8% Ability to Sell
4% Tech & Innovation
Finance & Corporate - Financial and accounting risks. Risks related to the execution of corporate activity and strategy
This chart displays the stock's most recent risk distribution according to category. TipRanks has identified 6 major categories: Finance & corporate, legal & regulatory, macro & political, production, tech & innovation, and ability to sell.

Risk Change Over Time

2020
Q4
S&P500 Average
Sector Average
Risks removed
Risks added
Risks changed
TXNM Energy Risk Factors
New Risk (0)
Risk Changed (0)
Risk Removed (0)
No changes from previous report
The chart shows the number of risks a company has disclosed. You can compare this to the sector average or S&P 500 average.

The quarters shown in the chart are according to the calendar year (January to December). Businesses set their own financial calendar, known as a fiscal year. For example, Walmart ends their financial year at the end of January to accommodate the holiday season.

Risk Highlights Q4, 2023

Main Risk Category
Finance & Corporate
With 7 Risks
Finance & Corporate
With 7 Risks
Number of Disclosed Risks
24
-7
From last report
S&P 500 Average: 31
24
-7
From last report
S&P 500 Average: 31
Recent Changes
0Risks added
7Risks removed
3Risks changed
Since Dec 2023
0Risks added
7Risks removed
3Risks changed
Since Dec 2023
Number of Risk Changed
3
-2
From last report
S&P 500 Average: 3
3
-2
From last report
S&P 500 Average: 3
See the risk highlights of TXNM Energy in the last period.

Risk Word Cloud

The most common phrases about risk factors from the most recent report. Larger texts indicate more widely used phrases.

Risk Factors Full Breakdown - Total Risks 24

Finance & Corporate
Total Risks: 7/24 (29%)Above Sector Average
Share Price & Shareholder Rights1 | 4.2%
Share Price & Shareholder Rights - Risk 1
Provisions of PNMR's organizational documents, as well as several other statutory and regulatory factors, will limit another party's ability to acquire PNMR and could deprive PNMR's shareholders of the opportunity to receive a takeover premium for shares of PNMR's common stock.
PNMR's restated articles of incorporation and by-laws include a number of provisions that may have the effect of discouraging persons from acquiring large blocks of PNMR's common stock or delaying or preventing a change in control of PNMR. The material provisions that may have such an effect include: - Authorization for the Board to issue PNMR's preferred stock in series and to fix rights and preferences of the series (including, among other things, voting rights and preferences with respect to dividends and other matters)- Advance notice procedures with respect to any proposal other than those adopted or recommended by the Board - Provisions specifying that only a majority of the Board, the chairman of the Board, the chief executive officer, or holders of at least one-tenth of all of PNMR's shares entitled to vote may call a special meeting of shareholders Under the New Mexico Public Utility Act, NMPRC approval is required for certain transactions that may result in PNMR's change in control or exercise of control, including ownership of 10% or more of PNMR's voting stock. PUCT approval is required for changes to the ownership of TNMP or its parent and certain other transactions relating to TNMP. Certain acquisitions of PNMR's outstanding voting securities also require FERC approval.
Accounting & Financial Operations2 | 8.3%
Accounting & Financial Operations - Risk 1
PNMR may be unable to meet its ongoing and future financial obligations and to pay dividends on its common stock if its subsidiaries are unable to pay dividends or distributions to PNMR.
PNMR is a holding company and has no operations of its own. PNMR's ability to meet its financial obligations and to pay dividends on its common stock primarily depends on the net earnings and cash flows of PNM and TNMP and their capacity to pay upstream dividends or distributions. Prior to providing funds to PNMR, PNM and TNMP have financial and regulatory obligations that must be satisfied, including among others, debt service and, in the case of PNM, preferred stock dividends. The NMPRC has placed certain restrictions on the ability of PNM to pay dividends to PNMR, including that PNM cannot pay dividends that cause its debt rating to fall below investment grade. The NMPRC has also restricted PNM from paying dividends in any year, as determined on a rolling four-quarter basis, in excess of net earnings without prior NMPRC approval. PNM is permitted to pay dividends to PNMR from prior equity contributions made by PNMR. Additionally, PNMR's financing agreements generally include a covenant to maintain a debt-to-capitalization ratio that does not exceed 70%, and PNM and TNMP's financing arrangements generally include a covenant to maintain debt-to-capitalization ratios that do not exceed 65%. PNM also has various financial covenants that limit the transfer of assets, through dividends or other means and the Federal Power Act imposes certain restrictions on dividends paid by public utilities, including that dividends cannot be paid from paid-in capital. Further, the ability of PNMR to declare dividends depends upon the extent to which cash flows will support dividends, the Company's financial circumstances and performance, economic conditions in the U.S. and in the Company's service areas,future growth plans and the related capital requirements, and other business considerations. Declaration of dividends may also be affected by decisions of the NMPRC, FERC, and PUCT in various regulatory cases currently pending or that may be docketed in the future, including the outcome of appeals of those decisions, conditions imposed by the NMPRC, PUCT, or Federal Power Act, and the effect of federal regulatory decisions and legislative acts.
Accounting & Financial Operations - Risk 2
Impairments of goodwill and long-lived assets of PNMR, PNM, and TNMP could adversely affect the Company's business, financial position, liquidity, and results of operations.
The Company annually evaluates recorded goodwill for impairment. See Note 1 and the Critical Accounting Policies and Estimates section of MD&A. Long-lived assets are also assessed whenever indicators of impairment exist. Factors that affect the long-term value of these assets, including treatment by regulators in ratemaking proceedings, as well as other economic and market conditions, could result in impairments. Significant impairments could adversely affect the Company's business, financial position, liquidity, and results of operations.
Debt & Financing4 | 16.7%
Debt & Financing - Risk 1
PNMR has counterparty credit risk in connection with financial support that was provided to facilitate the coal supply arrangement for SJGS. Adverse developments from these factors could have a negative impact on the business, financial condition, results of operations, and cash flows of PNM and PNMR.
PNMR has an arrangement with a bank under which the bank has issued $30.3 million of letters of credit in favor of sureties in order for the sureties to post reclamation bonds that are required under the miner's operating permit. The Company's financial position, results of operations, and cash flows could be negatively impacted if the current mine operator were to default on its obligations to reclaim the San Juan mine and PNMR is required to perform under the letter of credit support agreement.
Debt & Financing - Risk 2
Reduction in credit ratings or changing rating agency requirements could materially and adversely affect the Company's growth, strategy, business, financial position, results of operations, and liquidity.
PNMR, PNM, and TNMP cannot be sure that any of their current credit ratings will remain in effect for any given period of time or that a rating will not be put under review for a downgrade, lowered, or withdrawn entirely by a rating agency. As discussed in MD&A - Liquidity and Capital Resources, all of PNMR, PNM, and TNMP debt ratings are investments grade. Downgrades or changing requirements could result in increased borrowing costs due to higher interest rates on current borrowings or future financings, a smaller potential pool of investors, and decreased funding sources. Such conditions also could require the provision of additional support in the form of letters of credit and cash or other collateral to various counterparties.
Debt & Financing - Risk 3
Declines in values of marketable securities held in trust funds for pension and other postretirement benefits, in the NDT and coal mine reclamation trusts, and in the SJGS decommissioning trust could result in sustained increases in costs and funding requirements for those obligations, which may affect operational results.
The pension plans' targeted asset allocation is 50% liability matching fixed and 50% return generating income, which includes alternative income. The Company uses a strategy, known as Liability Driven Investing, which seeks to select investments that match the liabilities of the pension plans. The OPEB plans generally use the same pension fixed income and equity investment managers and utilize the same overall investment strategy as the pension plans, except there is no allocation to alternative investments and the OPEB plans have a target asset allocation of 30% equities and 70% fixed income. The NDT investment portfolio maintains a target of 80% fixed income and 20% equity securities. The current asset allocation exposes the NDT investment portfolio to market and macroeconomic factors. Declines in market values could result in increased funding of the trusts, the recognition of losses as impairments for the NDT and coal mine reclamation trusts, SJGS decommissioning trust, and additional expense for the benefit plans. In addition, a change in GAAP required that all changes in the fair value of equity securities recorded on the Company's balance sheet be reflected in earnings, which results in increased volatility in earnings.
Debt & Financing - Risk 4
Changes in interest rates could adversely affect our business.
Interest rates have increased and may continue to increase in the future. As a result, interest rates on future credit facilities and debt offerings could be higher than current levels, causing our financing costs to increase accordingly. In addition, because we use both fixed and variable rate debt, we are exposed to market risk due to the floating interest rates on our variable rate borrowings. Our results of operations, cash flows and financial position could be affected adversely by significant fluctuations in interest rates from current levels.
Production
Total Risks: 5/24 (21%)Below Sector Average
Manufacturing2 | 8.3%
Manufacturing - Risk 1
There are inherent risks in the ownership and operation of nuclear facilities.
Following the transfer of the PVNGS Unit 1 Leased Interest to SRP in January 2023 and the expiration of the leased interest in Unit 2 in January 2024, PNM currently has a 7.3% undivided interest in PVNGS. PVNGS represented 10.7% of PNM's total generating capacity as of December 31, 2023. PVNGS is subject to environmental, health, and financial risks including but not limited to the ability to obtain adequate supplies of nuclear fuel and water, the ability to dispose of spent nuclear fuel, decommissioning of the plant (see above), securing the facilities against possible terrorist attacks, and unscheduled outages due to equipment failures. The NRC has broad authority under federal law to impose licensing and safety-related requirements for the operation of nuclear generation facilities. Events at nuclear facilities of other operators or which impact the industry generally may lead the NRC to impose additional requirements and regulations on all nuclear generation facilities, including PVNGS. A major incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation or licensing of any domestic nuclear unit and to promulgate new regulations that could require significant capital expenditures and/or increase operating costs. In the event of noncompliance with its requirements, the NRC has the authority to impose a progressively increasing inspection regime that could ultimately result in the shutdown of a unit, civil penalties, or both, depending upon the NRC's assessment of the severity of the situation, until compliance is achieved. Increased costs resulting from penalties, a heightened level of scrutiny, and/or implementation of plans to achieve compliance with NRC requirements could adversely affect the financial condition, results of operations, and cash flows of PNMR and PNM. Although PNM has no reason to anticipate a serious nuclear incident at PVNGS, if an incident did occur, it could materially and adversely affect PNM's results of operations and financial condition. PNM has external insurance coverage to minimize its financial exposure to some risks. However, it is possible that liabilities associated with nuclear operations could exceed the amount of insurance coverage. See Note 16.
Manufacturing - Risk 2
The financial performance of PNMR, PNM, and TNMP may be adversely affected if power plants, other generation resources, and transmission and distribution systems do not operate reliably and efficiently.
The Company's financial performance depends on the successful operation of PNM's generation assets, as well as the transmission and distribution systems of PNM and TNMP. PNM's retirement of SJGS and the potential retirement of Four Corners will increase PNM's dependency on other generation resources, including renewable resources, gas-fired facilities, and PVNGS, and will reduce PNM's flexibility in managing those resources. Unscheduled or longer than expected maintenance outages, breakdown or failure of equipment or processes due to aging infrastructure, inability to install or operate renewable resources, temporary or permanent shutdowns to achieve environmental compliance, other performance problems with the generation assets, severe weather conditions, accidents and other catastrophic events, acts of war or terrorism, cybersecurity attacks, wildfires, disruptions in the supply, quality, and delivery of fuel and water supplies, and other factors could result in PNM's load requirements being larger than available system generation capacity. Unplanned outages of generating units and extensions of scheduled outages occur from time to time and are an inherent risk of the Company's business. If these were to occur, PNM would be required to purchase electricity in either the wholesale market or spot market at the then-current market price. There can be no assurance that sufficient electricity would be available at reasonable prices, or available at all. The failure of transmission or distribution facilities may also affect PNM's and TNMP's ability to deliver power. These potential generation, distribution, and transmission problems, and any service interruptions related to them, could result in lost revenues and additional costs.
Costs3 | 12.5%
Costs - Risk 1
Costs of decommissioning, remediation, and restoration of nuclear and fossil-fueled power plants, as well as reclamation of related coal mines, could exceed the estimates of PNMR and PNM as well as the amounts PNM recovers from its ratepayers, which could negatively impact results of operations and liquidity.
PNM has interests in a nuclear power plant, two coal-fired power plants, and several natural gas-fired power plants and is obligated to pay its share of the costs to decommission these facilities. PNM is also obligated to pay for its share of the costs of reclamation of the mines that supply coal to the coal-fired power plants. Likewise, other owners or participants are responsible for their shares of the decommissioning and reclamation obligations and it is important to PNM that those parties fulfill their obligations. Rates charged by PNM to its customers, as approved by the NMPRC, include a provision for recovery of certain costs of decommissioning, remediation, reclamation, and restoration. The NMPRC has established a cap on the amount of costs for the final reclamation of the surface coal mines that may be recovered from customers. PNM records estimated liabilities for its share of the legal obligations for decommissioning and reclamation. These estimates include many assumptions about future events and are inherently imprecise. In the event the costs to decommission the facilities or to reclaim the mines serving the plants exceed current estimates, or if amounts are not approved for recovery by the NMPRC, results of operations could be negatively impacted. The costs of decommissioning any nuclear power plant are substantial. PNM is responsible for all decommissioning obligations related to its entire interest in PVNGS, including portions under lease both during and after termination of the leases. PNM maintains trust funds designed to provide adequate financial resources for decommissioning PVNGS and SJGS, and for reclamation of the coal mine that served SJGS and continue to serve Four Corners at the end of their expected lives. However, if the PVNGS units are decommissioned before their planned date or the coal mine serving Four Corners is shut down sooner than expected, these funds may prove to be insufficient.
Costs - Risk 2
Customer electricity usage could be reduced by increases in prices charged and other factors. This could result in underutilization of PNM's generating capacity, as well as underutilization of the capacities of PNM's and TNMP's transmission and distribution systems. Should this occur, operating and capital costs might not be fully recovered, and financial performance could be negatively impacted.
A number of factors influence customers' electricity usage.  These factors include but are not limited to rates charged by PNM and TNMP, rates charged by REPs utilizing TNMP's facilities to deliver power, energy efficiency initiatives, unusual weather patterns, availability and cost of alternative sources of power, and national, regional, or local economic conditions. These factors and others may prompt customers to institute additional energy efficiency measures or take other actions that would result in lower energy consumption. If customers bypass or underutilize PNM's and TNMP's facilities through self-generation, renewable, or other energy resources, technological change, or other measures, revenues would be negatively impacted. PNM's and TNMP's service territories include several military bases and federally funded national laboratories, as well as large industrial customers that have significant direct and indirect impacts on the local economies where they operate.  The Company does not directly provide service to any of the military bases or national laboratories but does provide service to large industrial customers. The Company's business could be hurt from the impacts on the local economies associated with these customer groups as well as directly from the large industrial customers for a number of reasons including federally-mandated base closures, significant curtailment of the activities at the bases or national laboratories, and closure of industrial facilities or significant curtailment of their activities. Another factor that could negatively impact the Company is that proposals are periodically advanced in various localities to municipalize, or otherwise take over PNM's facilities, which PNM believes would require state legislative or other legal action to implement, or to establish new municipal utilities in areas currently served by PNM.  If any such initiative is successful, the result could be a material reduction in the usage of the facilities, a reduction in rate base, and reduced earnings. Should any of the above factors result in facilities being underutilized, the Company's financial position, results of operations, and cash flows could be significantly impacted.
Costs - Risk 3
Changed
The profitability of PNMR's utilities depends on being able to recover their costs through regulated rates and earn a fair return on invested capital, including investments in its generating plants. Without timely cost recovery, including recovery of undepreciated investments and the opportunity to earn a fair return on capital investments, PNMR's liquidity and results of operations could be negatively impacted. Further, PNM and TNMP are in a period of significant capital expenditures. While increased capital investments, higher interest rates, and other costs are placing upward pressure on rates charged to customers, energy efficiency initiatives and other factors are placing downward pressure on customer usage. The combination of these matters could adversely affect the Company's results of operations and cash flows.
The rates PNM charges its customers are regulated by the NMPRC and FERC. TNMP is regulated by the PUCT. The Company is in a period requiring significant capital investment and is projecting total construction expenditures for the years 2024-2028 to be $6.1 billion. PNM and TNMP anticipate a trend toward increasing costs, for which they will have to seek regulatory recovery. These costs include, or are related to, costs of asset construction for generation, transmission, and distribution systems necessary to provide electric service, as well as the cost to remove and retire existing assets, environmental compliance expenditures, regulatory mandates to acquire power from renewable resources, regulation related to nuclear safety, increased costs related to cybersecurity, increased interest costs to finance capital investments, and depreciation. If the NMPRC does not authorize appropriate recovery of any of the costs discussed above, including undepreciated generating resources at the time those resources are removed from service and fails to authorize recovery of the costs of obtaining power to replace those resources, PNM's financial position, results of operations, and cash flows could be negatively impacted. At the same time costs are increasing, there are factors placing downward pressure on the demand for power, thereby reducing customer usage. These factors include changing customer behaviors, including increased emphasis on energy efficiency measures and utilization of alternative sources of power, rate design that is not driven by economics, which could influence customer behavior, unfavorable economic conditions, reduced new sources of demand, and unpredictable weather patterns. The combination of costs increasing relatively rapidly and the technologies and behaviors that are reducing energy consumption places upward pressure on the per unit prices that must be charged to recover costs. This upward pressure on unit prices could result in additional efforts by customers to reduce consumption through alternative measures. Without timely cost recovery and the authorization to earn a reasonable return on invested capital, the Company's liquidity and results of operations could be negatively impacted. In December 2022, PNM filed the 2024 Rate Change that included investments in transmission and distribution infrastructure for the six years between 2019 through 2024 as primary drivers of PNM's identified revenue deficiency and a request for an ROE of 10.25%. The revenue deficiency is largely offset by cost reductions resulting from PNM's transition to lower-cost, clean generation resources. On January 3, 2024, the NMPRC issued a final order increasing non-fuel rates by a fraction of what was requested in the application and approving an ROE of 9.26%. The final order also provided for specific disallowances of PNM's undepreciated investments in Four Corners and PVNGS. This adverse outcome in the 2024 Rate Change could negatively impact PNM's financial position, results of operation, and cash flows. See Note 17. It is also possible that unsatisfactory outcomes of these matters, the financial impact of climate change regulation or legislation, other environmental regulations, the result of litigation, the adequacy and timeliness of cost recovery mechanisms, and other business considerations, could jeopardize the economic viability of certain generating facilities or the ability or willingness of individual participants to continue their participation through the periods currently contemplated in the agreements governing those facilities.
Macro & Political
Total Risks: 5/24 (21%)Above Sector Average
Economy & Political Environment2 | 8.3%
Economy & Political Environment - Risk 1
Changed
Supply chain issues, high inflation, actions by the Federal Reserve to address inflationary concerns and other market conditions, geopolitical activity and the resulting impact on business and economic conditions could negatively affect the Company's business, results of operations, financial condition, cash flows, and the trading value of PNMR's common stock and the Company's debt securities.
Continued supply chain issues were initially experienced during high inflation, actions by the Federal Reserve to address inflationary concerns or other market conditions, geopolitical activity and the resulting impact on the economy and financial markets could adversely affect the Company's business, results of operations, financial condition, cash flows, and access to the capital markets. The Company provides critical electric services and has implemented business continuity and emergency response plans to continue to provide these services to its customers and to support the Company's operations. The Company is also continuing to work with our suppliers to understand and mitigate the potential impacts to our supply chain and have taken steps to ensure the availability of critical components by increasing lead times and maintaining integrity of our systems. However, there is no assurance that the continued effects of these market conditions will not adversely impact our business, results of operations, financial condition, cash flows, ability to access the capital markets, and the trading value of the Company's common stock and debt securities. These effects could adversely impact the Company by: - reducing usage and/or demand for electricity by our customers in New Mexico and Texas;- causing delays and disruptions in the availability of and timely delivery of materials and components used in our operations;- causing delays and disruptions in the supply chain resulting in disruptions in the commercial operation dates of certain projects;- causing a deterioration in the credit quality of our counterparties, including power purchase agreement providers, contractors or retail customers, that could result in credit losses;- causing impairments of goodwill or long-lived assets and adversely impacting the Company's ability to develop, construct and operate facilities;- impacting the Company's ability to meet the requirements of the covenants in our existing credit facilities, including covenants regarding debt to capitalization;- causing a deterioration in our financial metrics or the business environment that impacts our credit ratings;- decreasing the value of our investment securities held in trusts for pension and other postretirement benefits, and for nuclear decommissioning, SJGS decommissioning, and coal mine reclamation, which could lead to increased funding requirements;- impacting our liquidity position and cost of and ability to access funds from financial institutions and capital markets; and - causing other unpredictable events.
Economy & Political Environment - Risk 2
General economic conditions of the nation and/or specific areas can affect the Company's customers and suppliers. Economic recession or downturn may result in decreased consumption by customers and increased bad debt expense, and could also negatively impact suppliers, all of which could negatively affect the Company.
Economic activity in the service territories of PNMR subsidiaries is a key factor in their performance. Decreased economic activity can lead to declines in energy consumption, which could adversely affect future revenues, earnings, and growth.  Higher unemployment rates, both in the Company's service territories and nationwide, could result in commercial customers ceasing operations and lower levels of income for residential customers. These customers might then be unable to pay their bills on time, which could increase bad debt expense and negatively impact results of operations and cash flows. Economic conditions also impact the supply and/or cost of commodities and materials needed to construct or acquire utility assets or make necessary repairs.
Natural and Human Disruptions2 | 8.3%
Natural and Human Disruptions - Risk 1
The impact of wildfires could negatively affect PNM's and TNMP's results of operations.
PNM and TNMP have large networks of electric transmission and distribution facilities. Weather conditions including severe drought, high winds, and the natural desert vegetation in the U.S. Southwest region and Texas could contribute to wildfires in or near PNM's and TNMP's service territories. PNM and TNMP take proactive steps to mitigate wildfire risk. However, wildfire risk is always present and PNM and TNMP could be held liable for damages incurred as a result of wildfires caused, or allegedly caused, by their transmission and distribution systems. In addition, wildfires could cause damage to PNM's and TNMP's assets that could result in loss of service to customers or make it difficult to supply power in sufficient quantities to meet customer needs. These events could have negative impacts on the Company's financial position, results of operations, and cash flows.
Natural and Human Disruptions - Risk 2
Changed
The operating results of PNMR and its operating subsidiaries are seasonal and are affected by weather conditions.
Electric generation, transmission, and distribution are generally seasonal businesses that vary with the demand for power. With power consumption typically peaking during the hot summer months, revenues traditionally peak during that period. As a result, quarterly operating results of PNMR and its operating subsidiaries vary throughout the year. In addition, PNMR and its operating subsidiaries have historically had lower revenues resulting in lower earnings when weather conditions are milder. Unusually mild weather in the future could reduce the revenues, net earnings, and cash flows of the Company. Drought conditions in New Mexico, especially in the "four corners" region, where Four Corners is located, may affect the water supply for PNM's generating plants.  If inadequate precipitation occurs in the watershed that supplies that region, PNM may have to decrease generation at these plants. This would require PNM to purchase power to serve customers and/or reduce the ability to sell excess power on the wholesale market and reduce revenues. Drought conditions or actions taken by the court system, regulators, or legislators could limit PNM's supply of water, which would adversely impact PNM's business. TNMP's service areas are exposed to extreme weather, including high winds, drought, flooding, ice storms, and periodic hurricanes. Extreme weather conditions, particularly high winds and severe thunderstorms, also occur periodically in PNM's service areas. These severe weather events can physically damage facilities owned by TNMP and PNM. Any such occurrence both disrupts the ability to deliver energy and increases costs. Extreme weather can also reduce customers' usage and demand for energy or could result in the Company incurring obligations to third parties related to such events. These factors could negatively impact results of operations and cash flows.
Capital Markets1 | 4.2%
Capital Markets - Risk 1
Disruption in the credit and capital markets may impact the Company's strategy and ability to raise capital.
PNMR and its subsidiaries rely on access to both short-term and longer-term capital markets as sources of liquidity for any capital requirements not satisfied by cash flow from operations. In general, the Company relies on its short-term credit facilities as the initial source to finance construction expenditures. This results in increased borrowings under the facilities over time. The Company is currently projecting total construction expenditures for the years 2024-2028 to be $6.1 billion. If PNMR or its operating subsidiaries are not able to access capital at competitive rates, or at all, PNMR's ability to finance capital requirements and implement its strategy will be limited. Disruptions in the credit markets, which could negatively impact the Company's access to capital, could be caused by an economic recession, declines in the health of the banking sector generally or the failure of specific banks who are parties to the Company's credit facilities, deterioration in the overall health of the utility industry, the bankruptcy of an unrelated energy company, war, terrorist attacks, cybersecurity attacks, or threatened attacks. If the Company's cash flow and credit and capital resources are insufficient to fund capital expenditure plans, the Company may be forced to delay important capital investments, sell assets, seek additional equity or debt capital, or restructure debt. In addition, insufficient cash flows and capital resources may result in reductions of credit ratings. This could negatively impact the Company's ability to incur additional indebtedness on acceptable terms and would result in an increase in the interest rates applicable under the Company's credit facilities. The Company's cash flow and capital resources may be insufficient to pay interest and principal on debt in the future. If that should occur, the Company's capital raising or debt restructuring measures may be unsuccessful or inadequate to meet scheduled debt service obligations. This could cause the Company to default on its obligations and further impair liquidity.
Legal & Regulatory
Total Risks: 4/24 (17%)Below Sector Average
Regulation1 | 4.2%
Regulation - Risk 1
Difficulties in obtaining permits and rights-of-way could negatively impact PNM's results of operations.
PNM's ability to execute planned operational activities and projects may be inhibited by difficulties in obtaining permits and rights-of-way and other delays. Many of PNM's transmission and distribution lines cross federal, state, and tribal lands. The Company can experience significant delays in obtaining approvals for new infrastructure, as well as renewals of existing rights-of-way and access for critical maintenance, including vegetation management on these lands. The environmental regulations governing siting and permitting on federal, state, and tribal lands are complex, involve multiple agencies, and include a public process. Any of these risk factors could result in higher costs, delays, or the inability to complete planned projects.
Taxation & Government Incentives1 | 4.2%
Taxation & Government Incentives - Risk 1
The impacts and implementation of U.S. tax reform legislation may negatively impact PNMR's, PNM's, and TNMP's businesses, financial position, results of operations, and cash flows.
Changes in tax laws may negatively impact PNMR's, PNM's, and TNMP's businesses, financial position, results of operations, and cash flows. The Company possesses tax credits and other carryforwards, the value of which could be diminished by new laws or the Company's ability to timely utilize them. Increases in tax rates may not be immediately recoverable through PNM's and TNMP's regulated rates, reducing earnings. Tax laws and regulations may also negatively impact the relative value of some resource investments over others, making those investments less competitive.
Environmental / Social2 | 8.3%
Environmental / Social - Risk 1
PNMR's utilities are subject to numerous comprehensive federal, state, tribal, and local environmental laws and regulations, including those related to climate change as well as increased stakeholder actions related to ESG matters and reducing GHG, which may impose significant compliance costs and may significantly limit or affect their operations and financial results.
Compliance with federal, state, tribal, and local environmental laws and regulations, including those addressing climate change, air quality, CCRs, discharges of wastewater originating from fly ash and bottom ash handling facilities, cooling water, ESG matters, GHG emissions, and other matters, may result in increased capital, operating, and other costs, particularly with regard to enforcement efforts focused on power plant emission control obligations. These costs could include remediation, containment, civil liability, and monitoring expenses. The Company cannot predict how it would be affected if existing environmental laws and regulations were to be repealed, revised, or reinterpreted, or if new environmental laws or regulations were to be adopted. See Note 16 and the Climate Change Issues subsection of the Other Issues Facing the Company section of MD&A. The utility industry is facing increasing stakeholder scrutiny related to ESG matters. Recently, PNMR has seen a rise in certain stakeholders, such as investors, customers, employees, and lenders, placing increasing importance on the impact and social cost associated with climate change. Federal GHG reduction measures setting emission guidelines remain in a state of uncertainty. Therefore, PNMR is dealing with an uncertain regulatory and policy environment and increased scrutiny and changing stakeholder expectations with respect to environmental and climate change programs, judicial decisions, and international accords. Under the Biden Administration, EPA and other federal agencies have sought to expand climate change regulations and work to aggressively reduce GHG emissions. Many state agencies, environmental advocacy groups, and other organizations will continue to focus on decarbonization with enhanced attention on GHG from fossil-fueled generation facilities. See discussion above and Note 17, regarding PNM's abandonment applications and the ETA. PNM currently depends on fossil-fueled generation for 43.3% of its electricity. As discussed under Climate Change Issues, this type of generation could be subject to future EPA or state regulations requiring GHG reductions. The anticipated expansion of federal and state regulations could result in additional operating restrictions on facilities and increased generation and compliance costs. CCRs from the operation of SJGS were used in the reclamation of a surface coal mine. These CCRs consist of fly ash, bottom ash, and gypsum. Any new regulation that would affect the reclamation process, including any future decision regarding classification of CCRs as hazardous waste, could significantly increase the costs of the disposal of CCRs and the costs of mine reclamation. In addition, PNM would incur additional costs to the extent the rule requires the closure or modification of CCR units at Four Corners or the construction of new CCR units beyond those already anticipated or requires corrective action to address releases from CCR disposal units at the site. See Note 16. A regulatory body may identify a site requiring environmental cleanup, including cleanup related to catastrophic events such as hurricanes or wildfires, and designate PNM or TNMP as a responsible party. There is also uncertainty in quantifying exposure under environmental laws that impose joint and several liability on all potentially responsible parties. Failure to comply with environmental laws and regulations, even if such non-compliance is caused by factors beyond PNM's or TNMP's control, may result in the assessment of civil or criminal penalties and fines. In the first round of the CAA regional haze program, BART determinations were made for both SJGS and Four Corners, requiring the facilities to reduce the levels of visibility-impairing emissions, including NOx, through the installation of control technology, resulting in operating cost increases. Deadlines for SIPs for the second planning period were in July 2021 which NMED was unable to meet. NMED is currently preparing its next regional haze SIP and notified PNM that it will not be required to submit a regional haze four-factor analysis for SJGS since PNM retired its share of SJGS in 2022. In February 2024, EPA proposed to impose a federal implementation plan on New Mexico to address the interstate transport of ozone and its precursors, referred to by EPA as the "good neighbor" rule. If finalized as proposed, compliance with the rule would require specified fossil fuel-fired generating resources to participate in an ozone-season NOx emission allowance trading program that will limit total NOx emissions from all affected units within the state of New Mexico. If PNM fails to timely obtain, maintain or comply with any required environmental regulatory approval, operations at affected facilities could be suspended or could subject PNM to additional expenses and potential penalties. Failure to comply with applicable environmental laws and regulations also could result in civil liability arising out of government enforcement actions or private claims. Environmental noncompliance could also result in reputational harm, which may cause stock price decreases or cause certain investors and financial institutions not to purchase the Company's debt securities or otherwise provide the Company with capital or credit on favorable terms, which may cause the cost of capital to increase. In addition, PNMR and its operating subsidiaries may underestimate the costs of environmental compliance, liabilities, and litigation due to the uncertainty inherent in these matters. Although there is uncertainty about the timing and form of the implementation of EPA's regulations regarding GHG emissions, climate change, CCRs, power plant emissions, changes to the ambient air quality standards, and other environmental issues, the promulgation and implementation of such regulations could have a material impact on operations. The Company is unable to estimate these costs due to the many uncertainties associated with, among other things, the nature and extent of future regulations and changes in existing regulations, including the changes in regulatory policy under the Biden Administration. Timely regulatory recovery of costs associated with any environmental-related regulations would be needed to maintain a strong financial and operational profile. The above factors could adversely affect the Company's business, financial position, results of operations, and liquidity.
Environmental / Social - Risk 2
PNMR, PNM, and TNMP are subject to complex government regulation unrelated to the environment, which may have a negative impact on their businesses, financial position and results of operations.
To operate their businesses, PNMR, PNM, and TNMP are required to have numerous permits and approvals from a variety of regulatory agencies. Regulatory bodies with jurisdiction over the utilities include the NMPRC, NMED, PUCT, TCEQ, ERCOT, FERC, NRC, EPA, and NERC. Oversight by these agencies covers many aspects of the Company's utility operations including, but not limited to: location, construction, and operation of facilities; the purchase of power under long-term contracts; conditions of service; the issuance of securities; and rates charged to customers. FERC has issued a number of rules pertaining to preventing undue discrimination in transmission services and electric reliability standards. The significant level of regulation imposes restrictions on the operations of the Company and causes the incurrence of substantial compliance costs. PNMR and its subsidiaries are unable to predict the impact on their business and operating results from future actions of any agency regulating the Company. Changes in existing regulations or the adoption of new ones could result in additional expenses and/or changes in business operations. Failure to comply with any applicable rules, regulations or decisions may lead to customer refunds, fines, penalties, and other payments, which could materially and adversely affect the results of operations and financial condition of PNMR and its subsidiaries.
Ability to Sell
Total Risks: 2/24 (8%)Above Sector Average
Competition1 | 4.2%
Competition - Risk 1
Advances in technology could make electric generating facilities less competitive.
Research and development activities are ongoing for new technologies that produce power or reduce power consumption. These technologies include renewable energy, customer-oriented generation, energy storage, and energy efficiency. PNM generates power at central station power plants to achieve economies of scale and produce power at a cost that is competitive with rates established through the regulatory process. There are distributed generation technologies that produce power, including fuel cells, microturbines, wind turbines, and solar cells, which have become increasingly cost competitive. These advances in technology have reduced the costs of these alternative methods of producing power to a level that is competitive with that of central station power production. In addition, advances made in the capabilities of energy storage have further decreased power production and peak usage through the dispatch of more battery systems. These technological advances have resulted in demand reduction that negatively impact revenue and/or result in underutilized assets that have been built to serve peak usage. In addition, certain federal, state, or local requirements that regulated utilities such as PNM are required to follow could result in third parties being able to provide electricity from similar generation technologies to consumers at prices lower than PNM is able to offer. As these technologies become more cost competitive or can be used by third-parties to supply power at lower prices than PNM is able to offer, PNM's energy sales and/or regulated returns could be eroded, and the value of its generating facilities could be reduced. Advances in technology could also change the channels through which electric customers purchase or use power, which could reduce the Company's sales and revenues or increase expenses. These advances can also create more uncertainty in load shapes and forecasts, which could have implications for generation and system planning.
Demand1 | 4.2%
Demand - Risk 1
Peak demand for power could exceed forecasted supply capacity, resulting in increased costs for purchasing capacity in the market or building additional generation facilities and/or battery storage facilities.
PNM is obligated to supply power to retail customers. As PNM continues to complete the significant transition in generation resources necessary to achieve 100% carbon emission-free generation by 2040, there are certain potential deliverability and cost risks associated with this transition. These risks are in three main areas, including 1) risk of completion of replacement resources prior to planned generation unit retirements, 2) increasing levels of renewable generation presenting risks of uncertainty and variability that will be further compounded as neighboring systems transition towards increasing levels of renewable resources, and 3) risks for mitigating possible resource volatility through a shrinking energy market. At peak times, power demand could exceed PNM's forecasted available generation capacity, particularly if PNM's power plants are not performing as anticipated and additional resources are not approved, or are not available, as PNM transitions its system to carbon emission-free generation and battery storage. Availability of this technology may create additional strain on the system by adding these additional resources without adequate storage. Additionally, further advances in the technology of renewable resources may need to occur in order to ensure that these resources meet carbon emission-free standards. Competitive market forces or adverse regulatory actions may require PNM to purchase capacity and energy from the market or build additional resources to meet customers' energy needs in an expedited manner. If that occurs, PNM may see opposition to recovery of these additional costs and could experience a lag between when costs are incurred and when regulators permit recovery in customers' rates. These situations could have negative impacts on results of operations and cash flows. As a result of construction delays, most of the SJGS replacement resources were not available for the 2022 and 2023 summer peak load periods. If these delays continue, PNM's existing resources, including available reserves, may be insufficient for 2024 summer peak load reliability. Prolonged delays in replacement resources for SJGS, PVNGS, availability of existing resources, and increased costs for purchasing capacity may negatively impact the results of operations and cash flows. See Note 17. In 2022, the NMPRC adopted revisions to the IRP Rule that revamp and modernize the planning process to accommodate increased stakeholder involvement. The IRP Rule establishes a collaborative facilitated process for a utility and stakeholders to agree on a statement of need for potential new or additional resources, as well as an action plan to guide procurement or development of resources to meet the stated need. Following acceptance of the statement of need and action plan, a utility will provide the NMPRC and intervenors drafts of the request for proposals ("RFP") and a timeline for issuing,receiving, evaluating, and ranking bids. The NMPRC will then appoint an Independent Monitor ("IM") to oversee the RFP process, which allows for parties and the IM to comment on the RFP consistency with the IRP, after which the utility issues the RFP. On December 2, 2022, PNM filed an appeal with the NM Supreme Court of the NMPRC's final order which adopted revisions to the IRP Rule. See Note 17. The proposed oversight of the procurement process is likely to prevent a utility's timely acquisition of necessary resources and may inhibit competitive procurement.
Tech & Innovation
Total Risks: 1/24 (4%)Below Sector Average
Cyber Security1 | 4.2%
Cyber Security - Risk 1
PNMR, PNM, and TNMP are subject to information security breaches and risks of unauthorized access to their information and operational technology systems as well as physical threats to assets.
The Company faces the risk of physical and cybersecurity attacks, both threatened and actual, against generation facilities, transmission and distribution infrastructure, information technology systems, and network infrastructure, which could negatively impact the ability of the Company to generate, transport, and deliver power, or otherwise operate facilities in the most efficient manner or at all. The utility industry in which the Company operates is a highly regulated industry that requires the continued operation of sophisticated information technology systems and network infrastructure, some of which are deemed to be critical infrastructure under NERC guidelines. Certain of the Company's systems are interconnected with external networks. In the regular course of business, the utilities handle a range of sensitive security and customer information. PNM and TNMP are subject to the rules of various agencies and the laws of various states, related to safeguarding and maintaining the confidentiality of this information. Cyber-attacks regularly occur, and generally are unsuccessful. To date, those few events that were successful did not result in significant or consequential business impacts. However, despite steps the Company may take to detect, mitigate, and/or eliminate threats and respond to security incidents, the techniques used by those who wish to obtain unauthorized access, and possibly disable or sabotage systems and/or abscond with information and data, change frequently and continue to evolve with the use of artificial intelligence and the Company may not be able to protect against all such actions. In the event that a capable adversary attacks the Company's computer and operating systems, despite the best efforts of the Company, the generation, transmission, or distribution of electrical services could be degraded or disrupted, customer information, business records, or other sensitive data could be lost, destroyed, or released outside of the Company's control. Further, the Company's use of technologies manufactured by third parties may be subject to espionage activities, and cyber-attack of the third party resulting in losses outside of the control of the Company. Although the Company has implemented security measures to identify, prevent, detect, respond to, and recover from cyber and physical security events and supply chain disruptions, critical infrastructure, including information and operational technology systems, are vulnerable to disability, failures, or unauthorized access, which could occur as a result of malicious compromise, employee error, and/or employee misconduct or supply compromise.  A successful physical or cybersecurity attack or other similar failure of the systems could impact the reliability of PNM's generation and PNM's and TNMP's transmission and distribution systems, including the possible unauthorized shutdown of facilities. Such an event could lead to disruptions of business operations, including the Company's ability to generate, transport, and deliver power to serve customers, to bill customers, and to process other financial information. A breach of the Company's information systems could also lead to the loss and destruction of confidential and proprietary data, personally identifiable information, trade secrets, intellectual property and supplier data, and could disrupt business operations which could harm the Company's reputation and financial results, as well as potential increased regulatory oversight, litigation, fines, and other remedial action. The costs incurred to investigate and remediate a physical or cybersecurity attack could be significant. A significant physical or cybersecurity attack on the Company's critical infrastructure could have an adverse impact on the operations, reputation and financial condition of PNMR, PNM, and TNMP.
See a full breakdown of risk according to category and subcategory. The list starts with the category with the most risk. Click on subcategories to read relevant extracts from the most recent report.

FAQ

What are “Risk Factors”?
Risk factors are any situations or occurrences that could make investing in a company risky.
    The Securities and Exchange Commission (SEC) requires that publicly traded companies disclose their most significant risk factors. This is so that potential investors can consider any risks before they make an investment.
      They also offer companies protection, as a company can use risk factors as liability protection. This could happen if a company underperforms and investors take legal action as a result.
        It is worth noting that smaller companies, that is those with a public float of under $75 million on the last business day, do not have to include risk factors in their 10-K and 10-Q forms, although some may choose to do so.
          How do companies disclose their risk factors?
          Publicly traded companies initially disclose their risk factors to the SEC through their S-1 filings as part of the IPO process.
            Additionally, companies must provide a complete list of risk factors in their Annual Reports (Form 10-K) or (Form 20-F) for “foreign private issuers”.
              Quarterly Reports also include a section on risk factors (Form 10-Q) where companies are only required to update any changes since the previous report.
                According to the SEC, risk factors should be reported concisely, logically and in “plain English” so investors can understand them.
                  How can I use TipRanks risk factors in my stock research?
                  Use the Risk Factors tab to get data about the risk factors of any company in which you are considering investing.
                    You can easily see the most significant risks a company is facing. Additionally, you can find out which risk factors a company has added, removed or adjusted since its previous disclosure. You can also see how a company’s risk factors compare to others in its sector.
                      Without reading company reports or participating in conference calls, you would most likely not have access to this sort of information, which is usually not included in press releases or other public announcements.
                        A simplified analysis of risk factors is unique to TipRanks.
                          What are all the risk factor categories?
                          TipRanks has identified 6 major categories of risk factors and a number of subcategories for each. You can see how these categories are broken down in the list below.
                          1. Financial & Corporate
                          • Accounting & Financial Operations - risks related to accounting loss, value of intangible assets, financial statements, value of intangible assets, financial reporting, estimates, guidance, company profitability, dividends, fluctuating results.
                          • Share Price & Shareholder Rights – risks related to things that impact share prices and the rights of shareholders, including analyst ratings, major shareholder activity, trade volatility, liquidity of shares, anti-takeover provisions, international listing, dual listing.
                          • Debt & Financing – risks related to debt, funding, financing and interest rates, financial investments.
                          • Corporate Activity and Growth – risks related to restructuring, M&As, joint ventures, execution of corporate strategy, strategic alliances.
                          2. Legal & Regulatory
                          • Litigation and Legal Liabilities – risks related to litigation/ lawsuits against the company.
                          • Regulation – risks related to compliance, GDPR, and new legislation.
                          • Environmental / Social – risks related to environmental regulation and to data privacy.
                          • Taxation & Government Incentives – risks related to taxation and changes in government incentives.
                          3. Production
                          • Costs – risks related to costs of production including commodity prices, future contracts, inventory.
                          • Supply Chain – risks related to the company’s suppliers.
                          • Manufacturing – risks related to the company’s manufacturing process including product quality and product recalls.
                          • Human Capital – risks related to recruitment, training and retention of key employees, employee relationships & unions labor disputes, pension, and post retirement benefits, medical, health and welfare benefits, employee misconduct, employee litigation.
                          4. Technology & Innovation
                          • Innovation / R&D – risks related to innovation and new product development.
                          • Technology – risks related to the company’s reliance on technology.
                          • Cyber Security – risks related to securing the company’s digital assets and from cyber attacks.
                          • Trade Secrets & Patents – risks related to the company’s ability to protect its intellectual property and to infringement claims against the company as well as piracy and unlicensed copying.
                          5. Ability to Sell
                          • Demand – risks related to the demand of the company’s goods and services including seasonality, reliance on key customers.
                          • Competition – risks related to the company’s competition including substitutes.
                          • Sales & Marketing – risks related to sales, marketing, and distribution channels, pricing, and market penetration.
                          • Brand & Reputation – risks related to the company’s brand and reputation.
                          6. Macro & Political
                          • Economy & Political Environment – risks related to changes in economic and political conditions.
                          • Natural and Human Disruptions – risks related to catastrophes, floods, storms, terror, earthquakes, coronavirus pandemic/COVID-19.
                          • International Operations – risks related to the global nature of the company.
                          • Capital Markets – risks related to exchange rates and trade, cryptocurrency.
                          What am I Missing?
                          Make informed decisions based on Top Analysts' activity
                          Know what industry insiders are buying
                          Get actionable alerts from top Wall Street Analysts
                          Find out before anyone else which stock is going to shoot up
                          Get powerful stock screeners & detailed portfolio analysis