We do not currently have, nor do we plan to acquire, the capability or infrastructure to manufacture our drug candidate for use in our clinical trials or for commercial sales, if any. As a result, we will be obligated to rely on contract manufacturers when we conduct clinical trials and if and when our initial or subsequent product candidates are approved for commercialization. In January 2020, we entered into a Master Agreement for Development, Manufacturing and Supply with CoreRx Inc. ("CoreRx"), pursuant to which CoreRx has agreed to provide to us certain product testing, development, and clinical manufacturing services for JAN101. We have not yet entered into any manufacturing agreements for the manufacture of JAN123 and must identify and contract with a company capable of producing sufficient quantities of this product for our clinical trials. We have not entered into agreements with any contract manufacturers for commercial supply for either JAN101 or JAN123 and may not be able to engage contract manufacturers for commercial supply of our initial or subsequent product candidates on favorable terms to us, or at all, should the need arise.
We do not currently have, nor do we plan to acquire, the capability or infrastructure to manufacture our drug candidate for use in our clinical trials or for commercial sales, if any. As a result, we will be obligated to rely on contract manufacturers when we conduct clinical trials and if and when our initial or subsequent product candidates are approved for commercialization. In January 2020, we entered into a Master Agreement for Development, Manufacturing and Supply with CoreRx Inc. ("CoreRx"), pursuant to which CoreRx has agreed to provide to us certain product testing, development, and clinical manufacturing services for JAN 101. We have not entered into agreements with any contract manufacturers for commercial supply and may not be able to engage contract manufacturers for commercial supply of our initial or subsequent product candidates on favorable terms to us, or at all, should the need arise.
In a previous clinical trial, the manufacture of JAN101 by a different manufacturing company resulted in a product that demonstrated initial instability that led to the product being out-of-specification. While the FDA allowed the trial to continue, there is no guarantee that, if the product manufactured by CoreRx is similarly unstable, the FDA will allow us to continue to develop that product. Even if the product manufactured by CoreRx is stable, the FDA may require additional studies to confirm the stability of the product, increasing development cost and times.
The facilities used by CoreRx to manufacture JAN101 must be approved by the FDA or comparable foreign regulatory authorities. Such approvals are subject to inspections that will be conducted after we submit an NDA to the FDA or their equivalents to other relevant regulatory authorities. We will not control the manufacturing process of JAN101, JAN123 or subsequent product candidates and will be completely dependent on our contract manufacturing partners for compliance with cGMPs, for manufacture of both active drug substances and finished drug products. These cGMP regulations cover all aspects of the manufacturing, testing, quality control, storage, distribution, and record keeping relating to our initial or subsequent product candidates. If our contract manufacturers do not successfully manufacture material that conforms to our specifications and the strict regulatory requirements of the FDA or others, we will not be able to secure or maintain regulatory approval for products made at their manufacturing facilities. If the FDA or a comparable foreign regulatory authority does not approve these facilities for the manufacture of our initial or subsequent product candidates or if it withdraws any such approval in the future, we may need to find alternative manufacturing facilities, which would significantly impact our ability to develop, manufacture, obtain regulatory approval for, or market our initial or subsequent product candidates, if approved. Likewise, we could be negatively impacted if any of our contract manufacturers elect to discontinue their business relationship with us.
Our contract manufacturer will be subject to ongoing periodic unannounced inspections by the FDA and corresponding state and foreign agencies for compliance with cGMPs and similar regulatory requirements. We will not have control over our contract manufacturer's compliance with these regulations and standards. Failure by our contract manufacturer to comply with applicable regulations could result in sanctions being imposed on us, including fines, injunctions, civil penalties, failure to grant approval to market JAN101 or JAN123, delays, suspensions or withdrawals of approvals, inability to supply product, operating restrictions, and criminal prosecutions, any of which could significantly and adversely affect our biotechnology business. In addition, we will not have control over the ability of our contract manufacturer to maintain adequate quality control, quality assurance, and qualified personnel. Failure by our contract manufacturer to comply with or maintain any of these standards could adversely affect our ability to develop, manufacture, obtain regulatory approval for or market JAN101 or JAN123, if approved.
Our manufacturer must obtain the API from a third party. A number of groups manufacture our API; however, some of these are manufactured as a food product, and others, while manufactured under GMP, do not have the required Drug Master File on file with the FDA. CoreRx identified an API from Merck KGaA for use in the current production of clinical grade JAN101. At the time of the manufacture of the API, the product met the specifications outlined in both the drug substance monographs for Europe and the US. However, subsequent to the manufacture of the API, the US monograph was changed in the US Pharmacopeia ("USP") and, while most of the tests conform, Merck KGaA was unable to complete two of the new testing requirements. Although the two tests are not considered safety issues and do not impact the quality of the product, there is no guarantee the FDA will approve the product for clinical trials if the two tests are not completed, which could delay our ability to start the Phase IIb clinical trial, as planned. Identifying an analytical laboratory to perform the two tasks may be difficult and could require development and validation of the tests, adding both time and costs to us. In addition, there is no guarantee that, once developed, the product will meet the specifications as outlined in the USP. Even if the FDA allows the current product to be used in the Phase IIb clinical trial, there is no guarantee that the FDA will allow further clinical work with the product or commercialization of the product until it is shown to conform to USP standards. We may be required to work with the API manufacturer to file the appropriate documents and there is no guarantee that the FDA will approve the filing. This could necessitate additional funding to hire an API manufacturer and produce the product under GMP with all necessary filings.
If, for any reason, these third parties are unable or unwilling to perform, we may not be able to locate alternative manufacturers or formulators or enter into favorable agreements with them and we cannot be certain that any such third parties will have the manufacturing capacity to meet future requirements. If these manufacturers or any alternate manufacturer of finished drug product experiences any significant difficulties in its respective manufacturing processes for APIs or finished products or should cease doing business with us for any reason, we could experience significant interruptions in the supply of our initial or subsequent product candidates or may not be able to create a supply of any of our ls at all. Were we to encounter manufacturing difficulties, our ability to produce a sufficient supply of any of our product candidates might be negatively affected. Our inability to coordinate the efforts of our third-party manufacturing partners, or the lack of capacity available at our third-party manufacturing partners, could impair our ability to supply any of our product candidates at required levels. Because of the significant regulatory requirements that we would need to satisfy in order to qualify a new bulk drug substance or finished product manufacturer, if we face these or other difficulties with our then-current manufacturing partners, we could experience significant interruptions in the supply of any of our product candidates if we decided to transfer the manufacture of any of our product candidates to one or more alternative manufacturers in an effort to deal with such difficulties.
CoreRx currently serves as our sole manufacturer of JAN101. As CoreRx also manufactures other products, there can be no guarantee that CoreRx will have the capacity to manufacture additional clinical product for us in a timely manner, when required, which could lead to significant delays in initiating other clinical studies. CoreRx will unlikely have the capacity to manufacture the amount of product needed, if and when JAN101 is approved for marketing. This would necessitate identifying additional manufacturer(s) who may or may not be able to replicate the manufacturing process developed at CoreRx. In addition, the increase in quantities required for commercialization of the product, if commercialization occurs, could require modifying the manufacturing process to produce larger quantities of tablets more efficiently. Such modifications of the manufacturing process, if even possible, could result in significant delays in the delivery of the product.
We will be validating the manufacturing process, with appropriate process parameters and critical process, at CoreRx in 2024. Based on current batch sizes, these validated processes will support the manufacture of approximately 6.5 million tablets a month. This would allow us to enter the marketplace, but would support sales of only 1-2% of the addressable market. There is no guarantee that CoreRx will increase its manufacturing capacity when needed by us; thus, we will likely need to identify another approved manufacturer with increased capacity. In addition, we will need to revalidate the manufacturing process to demonstrate to the FDA the ability to reproducibly manufacture larger batch sizes, which will increase time and costs. If these activities are not carried out in a timely manner, a shortage of product could result following commercial launch, which could significantly affect sales and overall valuation of the Company.
Any manufacturing problem or the loss of our contract manufacturer could be disruptive to our operations and result in development delays and lost sales. Additionally, we will rely on third parties to supply the raw materials needed to manufacture our initial or subsequent product candidates. Any such reliance on suppliers may involve several risks, including a potential inability to obtain critical materials and reduced control over production costs, delivery schedules, reliability, and quality. Any unanticipated disruption to the operation of one of our contract manufacturers caused by problems with suppliers could delay shipment of any of our product candidates, increase our cost of goods sold and result in lost sales.