GSE Solutions announced that they were selected to upgrade the OL1 and OL2 training simulators at Olkiluoto Nuclear Power Plant, located in Eurajoki, Finland. The Olkiluoto Nuclear Power Plant is owned by Finnish nuclear power company Teollisuuden Voima Oyj [TVO]. It is widely recognized for its record of safe operations, high availability, and decades of environmentally friendly electricity generation. GSE built the original OL1 and OL2 simulators in the 1980’s. Since then, GSE has continued to service and upgrade the simulators at various delivery points. This contract will be fulfilled in two stages between now and August 2025 and will include the following: An upgrade to the plant containment building model with a new JTopmeretTM based model for the OL1 and OL2 training simulators; A replacement of the existing Theatre-based reactor thermohydraulic model with GSE’s latest RELAP 5-HD solution; These upgrades will enhance the operator’s experience, taking advantage of the latest advances in simulation technology to provide even more realism to the training sessions and see phenomena not previously available with the legacy systems.
Published first on TheFly
See Insiders’ Hot Stocks on TipRanks >>
Read More on GVP:
- The US may be on the brink of a nuclear renaissance; Here are 2 stocks under $5 that stand to benefit
- GSE Systems initiated with a Buy at H.C. Wainwright
- GSE Systems awarded $800K contract
- GSE Systems announces contract to work with Nuscale Power
- GSE Systems awarded new contract by US Government engineering laboratories
Questions or Comments about the article? Write to editor@tipranks.com