Premier African Minerals (GB:PREM) has released an update.
Premier African Minerals Limited reports significant advancements at their Zulu Lithium and Tantalum operations, with the flotation circuit now continuously producing saleable spodumene concentrate. Despite some initial design and equipment challenges, the plant is running at 50% capacity with improvements and upgrades underway, projecting a target production of 50 tonnes of spodumene concentrate per day. The company is optimistic about the higher-than-expected ore grades and is working towards achieving the full projected monthly capacity of 4,000 tonnes.
For further insights into GB:PREM stock, check out TipRanks’ Stock Analysis page.